{"id":9153,"date":"2023-08-24T15:49:00","date_gmt":"2023-08-24T15:49:00","guid":{"rendered":"https:\/\/pt.venngage.com\/blog\/?p=9153"},"modified":"2023-09-11T20:12:54","modified_gmt":"2023-09-11T20:12:54","slug":"o-que-e-projeto-de-melhoria","status":"publish","type":"post","link":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/","title":{"rendered":"O que \u00e9 um projeto de melhoria de processo [+20 modelos inclu\u00eddos]"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png\" alt=\"o-que-e-projeto-de-melhoria\" class=\"wp-image-9155\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria-300x169.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria-730x411.png 730w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n<p>Um projeto de melhoria de processo \u00e9 um documento abrangente e acion\u00e1vel que descreve as etapas necess\u00e1rias para aumentar a efici\u00eancia, a efic\u00e1cia e o desempenho geral dos processos e procedimentos em sua empresa. Essa ferramenta de gest\u00e3o tem como objetivo identificar \u00e1reas de melhoria, solucionar gargalos, simplificar o fluxo de trabalho e otimizar a utiliza\u00e7\u00e3o de recursos.<\/p>\n\n\n\n<p>Um projeto de melhoria de processos bem elaborado deve fornecer recomenda\u00e7\u00f5es espec\u00edficas e pr\u00e1ticas aplic\u00e1veis a v\u00e1rias fun\u00e7\u00f5es e departamentos da organiza\u00e7\u00e3o, permitindo uma implementa\u00e7\u00e3o ampla e benef\u00edcios consistentes em toda a empresa. Ao adotar um plano de melhoria de processos, as empresas podem promover mudan\u00e7as positivas em suas equipes de forma proativa, a melhoria cont\u00ednua no ambiente de trabalho e alcan\u00e7ar n\u00edveis mais elevados de excel\u00eancia operacional.<\/p>\n\n\n\n<p>Muitos aspectos do projeto de melhoria de processos podem se beneficiar dos recursos de comunica\u00e7\u00e3o visual, como infogr\u00e1ficos, apresenta\u00e7\u00f5es, mapas mentais e muito mais. <a href=\"https:\/\/venngage.com\/solutions\/training-materials\" target=\"_blank\" rel=\"noreferrer noopener\">As equipes do Venngage para Aprendizado e Desenvolvimento<\/a>&nbsp;facilitam a cria\u00e7\u00e3o de seus pr\u00f3prios ativos visuais para ajudar a implementar e gerenciar seus planos de melhoria de processo.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>COMECE A CRIAR DE GRA\u00c7A<\/b><\/button><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"toc\"><strong>Clique para avan\u00e7ar:<\/strong><\/h3>\n\n\n\n<ul>\n<li><a href=\"#1\" rel=\"nofollow\">Como criar um plano de melhoria de processo?<\/a>\n<ul>\n<li><a href=\"#2\">Estudo de caso do plano de melhoria de processos<\/a><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"#3\">Quais s\u00e3o os tipos mais comuns de projetos de melhoria de processo?<\/a><\/li>\n\n\n\n<li><a href=\"#4\">O que \u00e9 um projeto de melhoria de processo?<\/a><\/li>\n\n\n\n<li><a href=\"#5\">Tipos de projetos de melhoria de processo e exemplos<\/a><\/li>\n\n\n\n<li><a href=\"#6\">Quais s\u00e3o os benef\u00edcios de estabelecer um plano de melhoria cont\u00ednua de processos?<\/a><\/li>\n\n\n\n<li><a href=\"#7\">Perguntas frequentes sobre o projeto de melhoria de processo<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1\"><strong>Como criar um plano de melhoria de processo?<\/strong><\/h2>\n\n\n\n<p>A mudan\u00e7a n\u00e3o \u00e9 f\u00e1cil e pode ser um desafio para as empresas descobrirem o que est\u00e3o fazendo de errado e como corrigir. \u00c9 por isso que estabelecer uma estrutura de projeto de melhoria de processo pode ajud\u00e1-lo a tomar decis\u00f5es baseadas em fatos sobre como melhorar sua organiza\u00e7\u00e3o.<\/p>\n\n\n\n<p>Um projeto de melhoria de processo bem projetado pode ajud\u00e1-lo a agilizar as opera\u00e7\u00f5es, aumentar a produtividade e impulsionar o crescimento organizacional do seu neg\u00f3cio. Para te ajudar, aqui est\u00e3o dez etapas essenciais para criar um projeto de melhoria de processo que produza resultados mensur\u00e1veis:<\/p>\n\n\n\n<ol>\n<li><strong>Identifique as metas:<\/strong>Defina os objetivos espec\u00edficos que voc\u00ea pretende alcan\u00e7ar por meio da melhoria do processo. Por exemplo, reduzir o tempo de espera do cliente em 20% ou diminuir os erros de produ\u00e7\u00e3o em 15%.<\/li>\n\n\n\n<li><strong>Analise os processos atuais:<\/strong>Avalie minuciosamente os fluxos de trabalho existentes para identificar gargalos, inefici\u00eancias e \u00e1reas que precisam de melhoria. Por exemplo, examine como as informa\u00e7\u00f5es fluem entre os departamentos ou como o estoque \u00e9 gerenciado.<\/li>\n\n\n\n<li><strong>Re\u00fana informa\u00e7\u00f5es das partes interessadas:<\/strong>Envolva funcion\u00e1rios, gerentes e outras partes interessadas relevantes para reunir percep\u00e7\u00f5es e perspectivas sobre os desafios do processo. Exemplo: conduza entrevistas ou pesquisas, ou integre uma <a href=\"https:\/\/www.nextiva.com\/blog\/cloud-contact-center.html\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">solu\u00e7\u00e3o de central de atendimento na nuvem<\/a>, para coletar feedback sobre pontos problem\u00e1ticos e poss\u00edveis solu\u00e7\u00f5es.<\/li>\n\n\n\n<li><strong>Priorize as \u00e1reas de melhoria:<\/strong>Com base na an\u00e1lise e nas contribui\u00e7\u00f5es das partes interessadas, priorize as \u00e1reas que requerem aten\u00e7\u00e3o imediata. Isso pode envolver a identifica\u00e7\u00e3o de processos de alto impacto que, quando melhorados, ter\u00e3o um efeito positivo significativo na organiza\u00e7\u00e3o.<\/li>\n\n\n\n<li><strong>Defina objetivos mensur\u00e1veis:<\/strong>Estabele\u00e7a objetivos espec\u00edficos e mensur\u00e1veis que se alinhem com as \u00e1reas de melhoria identificadas. Esses objetivos devem ser quantific\u00e1veis e ter prazo definido. Por exemplo, reduza as reclama\u00e7\u00f5es dos clientes em 25% no prazo de seis meses.<\/li>\n\n\n\n<li><strong>Desenvolva planos de a\u00e7\u00e3o:<\/strong>Crie planos de a\u00e7\u00e3o usando uma metodologia detalhada para cada \u00e1rea de melhoria. Descreva as etapas, responsabilidades e cronogramas para implementar as mudan\u00e7as. Por exemplo, designe uma equipe multifuncional para otimizar o processo de atendimento de pedidos e desenvolver um cronograma para concluir as mudan\u00e7as necess\u00e1rias.<\/li>\n\n\n\n<li><strong>Implemente as Mudan\u00e7as:<\/strong>Execute os planos de a\u00e7\u00e3o monitorando de perto o progresso de cada etapa definida. Isso vai garantir o cumprimento dos cronogramas estabelecidos e evitar problema de atraso nas entregas. Exemplo: introduzir um novo software para a automa\u00e7\u00e3o de tarefas manuais de entrada de dados e rastrear os principais indicadores de desempenho.<\/li>\n\n\n\n<li><strong>Medir os resultados:<\/strong>Me\u00e7a e avalie regularmente o impacto das mudan\u00e7as implementadas em rela\u00e7\u00e3o aos objetivos definidos. Isso pode envolver o rastreamento de m\u00e9tricas como economia de custos, melhorias de produtividade ou \u00edndices de satisfa\u00e7\u00e3o do cliente.<\/li>\n<\/ol>\n\n\n\n<ol>\n<li><strong>Ajuste e refine seu projeto de melhoria:<\/strong>Com base nos resultados, identifique quaisquer lacunas ou \u00e1reas que precisam de melhorias. Ajuste os planos de a\u00e7\u00e3o de acordo com a necessidade, fazendo refinamentos iterativos para uma melhoria cont\u00ednua dos processos.<\/li>\n\n\n\n<li><strong>Comunicar e engajar:<\/strong><br>Mantenha todas as pessoas interessadas bem informadas sobre o andamento das iniciativas de melhoria de processos para incentivar seu envolvimento cont\u00ednuo. Compartilhe hist\u00f3rias de sucesso e celebre as conquistas para manter a motiva\u00e7\u00e3o e o engajamento da sua equipe. Lembre-se: uma boa comunica\u00e7\u00e3o interna \u00e9 fundamental para o processo de melhoria cont\u00ednua dos seus projetos.<\/li>\n<\/ol>\n\n\n\n<p>Aderindo a essas diretrizes, voc\u00ea criar\u00e1 um formid\u00e1vel projeto de melhoria de processo capaz de impulsionar um crescimento transformador dentro de sua organiza\u00e7\u00e3o. Lembre-se de que a melhoria cont\u00ednua do processo \u00e9 uma odisseia em constante evolu\u00e7\u00e3o, e o exame minucioso e os ajustes sempre que houver necessidade garantir\u00e3o os melhores resultados em suas opera\u00e7\u00f5es.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"2\"><strong>Estudo de Caso do Plano de Melhoria de Processos<\/strong><\/h3>\n\n\n\n<p>Seguindo os passos descritos anteriormente, vamos explorar um plano hipot\u00e9tico de melhoria de processo para um consult\u00f3rio m\u00e9dico que constantemente recebe reclama\u00e7\u00f5es de pacientes sobre a quantidade de formul\u00e1rios que precisam preencher.<\/p>\n\n\n\n<p><strong>Projeto de Melhoria de Processos: Reduzindo a Sobrecarga de Formul\u00e1rios de Pacientes em um Consult\u00f3rio M\u00e9dico<\/strong><\/p>\n\n\n\n<ol>\n<li><strong>Identificar as metas:<\/strong>A meta \u00e9 agilizar o processo de admiss\u00e3o de pacientes e reduzir o n\u00famero de formul\u00e1rios que eles precisam preencher, resultando em maior satisfa\u00e7\u00e3o do paciente e redu\u00e7\u00e3o da carga administrativa.<\/li>\n\n\n\n<li><strong>Analisar os processos atuais:<\/strong>Avalie o processo de admiss\u00e3o de pacientes existente para identificar o n\u00famero e os tipos de formul\u00e1rios que devem ser preenchidos, bem como quaisquer redund\u00e2ncias ou inefici\u00eancias no processo.<\/li>\n\n\n\n<li><strong>Re\u00fana as opini\u00f5es das partes interessadas:<\/strong>Envolva-se com pacientes, funcion\u00e1rios da recep\u00e7\u00e3o e profissionais de sa\u00fade para entender suas perspectivas sobre os desafios relacionados aos formul\u00e1rios e obter poss\u00edveis ideias. Realize pesquisas ou mantenha discuss\u00f5es em grupos focais para coletar as informa\u00e7\u00f5es.<\/li>\n\n\n\n<li><strong>Priorize as \u00e1reas de melhoria:<\/strong>Identifique as principais \u00e1reas impactadas com a redu\u00e7\u00e3o de formul\u00e1rios, tanto na experi\u00eancia do paciente quanto na efici\u00eancia administrativa. Por exemplo, concentre-se na elimina\u00e7\u00e3o de informa\u00e7\u00f5es redundantes em formul\u00e1rios ou na consolida\u00e7\u00e3o de v\u00e1rios formul\u00e1rios em um \u00fanico documento mais abrangente.<\/li>\n\n\n\n<li><strong>Defina objetivos mensur\u00e1veis:<\/strong>Estabele\u00e7a objetivos espec\u00edficos, como reduzir o n\u00famero de formul\u00e1rios em 50% dentro de um prazo de tr\u00eas meses, minimizar o tempo gasto pelos pacientes no preenchimento de formul\u00e1rios em 25% ou atingir um \u00edndice de satisfa\u00e7\u00e3o do paciente de 80% no processo de recebimento de formul\u00e1rios.<\/li>\n\n\n\n<li><strong>Desenvolva planos de a\u00e7\u00e3o:<\/strong>Crie planos de a\u00e7\u00e3o para simplificar o processo de admiss\u00e3o de pacientes e minimizar os requisitos de formul\u00e1rio. Exemplos de a\u00e7\u00f5es podem ser inclu\u00eddas:<\/li>\n<\/ol>\n\n\n\n<ul>\n<li>Realize uma revis\u00e3o completa dos formul\u00e1rios existentes e identifique \u00e1reas de sobreposi\u00e7\u00e3o ou duplica\u00e7\u00e3o.<\/li>\n\n\n\n<li>Consulte as equipes jur\u00eddicas e de conformidade para garantir que as informa\u00e7\u00f5es necess\u00e1rias sejam capturadas, minimizando as redund\u00e2ncias.<\/li>\n\n\n\n<li>Explorar a possibilidade de implementa\u00e7\u00e3o de formul\u00e1rios eletr\u00f4nicos ou registro pr\u00e9vio online para agilizar o processo.<\/li>\n\n\n\n<li>Treine a equipe da recep\u00e7\u00e3o no novo processo simplificado e eduque-a sobre como ajudar os pacientes a preencher os formul\u00e1rios com efici\u00eancia.<\/li>\n<\/ul>\n\n\n\n<ol>\n<li><strong>Implemente as mudan\u00e7as:<\/strong>Executar os planos de a\u00e7\u00e3o implementando as melhorias acordadas. Isso pode envolver a revis\u00e3o e consolida\u00e7\u00e3o de formul\u00e1rios, implementa\u00e7\u00e3o de formul\u00e1rios eletr\u00f4nicos ou sistemas de pr\u00e9-registro on-line e treinamento de pessoal sobre o processo revisado.<\/li>\n\n\n\n<li><strong>Medir os resultados:<\/strong>Me\u00e7a e avalie regularmente o impacto das mudan\u00e7as implementadas em rela\u00e7\u00e3o aos objetivos definidos. Rastreie m\u00e9tricas como o n\u00famero de formul\u00e1rios eliminados, tempo economizado e \u00edndices de satisfa\u00e7\u00e3o do paciente relacionados ao processo de admiss\u00e3o revisado.<\/li>\n<\/ol>\n\n\n\n<ol>\n<li><strong>Ajuste e refine o projeto de melhoria:<\/strong>Com base nos resultados e no feedback cont\u00ednuo, identifique as \u00e1reas que precisam de melhorias adicionais. Refine o processo abordando quaisquer pontos problem\u00e1ticos ou gargalos remanescentes para garantir uma experi\u00eancia de atendimento do paciente perfeita e eficiente.<\/li>\n\n\n\n<li><strong>Comunique-se e envolva-se:<\/strong>Mantenha uma comunica\u00e7\u00e3o aberta com pacientes, funcion\u00e1rios e profissionais de sa\u00fade durante toda a jornada de melhoria do processo. Informe os pacientes sobre as mudan\u00e7as e melhorias feitas no processo de recebimento de formul\u00e1rios e incentive seus coment\u00e1rios e sugest\u00f5es para melhorias adicionais.<\/li>\n<\/ol>\n\n\n\n<p>Ao implementar esse plano de melhoria de processo, o consult\u00f3rio m\u00e9dico pode minimizar a carga sobre os pacientes, reduzindo o n\u00famero de formul\u00e1rios que eles precisam preencher, resultando em uma maior satisfa\u00e7\u00e3o do paciente e processos administrativos simplificados. Lembre-se de que a avalia\u00e7\u00e3o e o refinamento cont\u00ednuos s\u00e3o essenciais para que voc\u00ea possa se adaptar \u00e0 evolu\u00e7\u00e3o das necessidades do paciente e garantir melhorias cont\u00ednuas em seus servi\u00e7os.<\/p>\n\n\n\n<p>Voc\u00ea pode personalizar este modelo de plano de melhoria de processo para refletir o exemplo acima:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/lean-six-sigma-improvement-process-plan-61143eb5-1655-4c55-a3c8-1c216af71863\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma.png\" alt=\"Plano de Processo de Melhoria Lean Six Sigma\" class=\"wp-image-9159\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma.png 1268w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-152x300.png 152w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-520x1024.png 520w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-780x1536.png 780w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-1040x2048.png 1040w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-730x1438.png 730w\" sizes=\"(max-width: 1268px) 100vw, 1268px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/lean-six-sigma-improvement-process-plan-61143eb5-1655-4c55-a3c8-1c216af71863\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p><strong><a href=\"#toc\">Volte ao \u00edndice<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3\"><strong>Quais s\u00e3o os tipos mais comuns de projetos de melhoria de processo?<\/strong><\/h2>\n\n\n\n<p>Existem metodologias importantes de melhoria de processo que voc\u00ea pode considerar integrar em seus projetos. Alguns desses m\u00e9todos s\u00e3o utilizados nas maiores empresas do mundo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Six Sigma<\/strong><\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/lean-six-sigma-improvement-process-plan-mind-map-8efe5f2d-605d-4368-8874-72acb1b2eb59\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-2.png\" alt=\"Mapa Mental do Plano de Processo de Melhoria Lean Six Sigma\" class=\"wp-image-9160\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-2.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-2-300x232.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-2-1024x791.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Processo-de-Melhoria-Lean-Six-Sigma-2-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/lean-six-sigma-improvement-process-plan-mind-map-8efe5f2d-605d-4368-8874-72acb1b2eb59\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Um m\u00e9todo de controle de qualidade desenvolvido por um engenheiro da Motorola, o Six Sigma tornou-se um fen\u00f4meno global e essa certifica\u00e7\u00e3o vem sendo muito utilizada em diversos setores. Tamb\u00e9m conhecido como m\u00e9todo DMAIC (Define, Measure, Analyze, Improve e Control), o Six Sigma descreve <a href=\"https:\/\/www.venki.com.br\/blog\/metodologia-six-sigma\/#:~:text=As%20cinco%20etapas%20essenciais%20para%20o%20planejamento%20e,processos%20e%20identificar%20oportunidades%20de%20melhor%C3%A1-los.%20Mais%20itens\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">cinco etapas<\/a>&nbsp;para melhorar as pr\u00e1ticas de neg\u00f3cios existentes, que s\u00e3o:<\/p>\n\n\n\n<ul>\n<li>Definir<\/li>\n\n\n\n<li>Medir<\/li>\n\n\n\n<li>Analisar<\/li>\n\n\n\n<li>Melhorar<\/li>\n\n\n\n<li>Controlar<\/li>\n<\/ul>\n\n\n\n<p>Veja como deve ser um plano de melhoria de processo ao usar o m\u00e9todo Six Sigma:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/diagrams\/lean-six-sigma-dmaic-process-flowchart-48f8d231-6a05-414e-ad40-9dc33a2e653e\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-processo-Lean-Six-Sigma-DMAIC.png\" alt=\"Fluxograma do processo Lean Six Sigma DMAIC\" class=\"wp-image-9161\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-processo-Lean-Six-Sigma-DMAIC.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-processo-Lean-Six-Sigma-DMAIC-300x232.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-processo-Lean-Six-Sigma-DMAIC-1024x791.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-processo-Lean-Six-Sigma-DMAIC-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/diagrams\/lean-six-sigma-dmaic-process-flowchart-48f8d231-6a05-414e-ad40-9dc33a2e653e\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Lean &amp; Lean Six Sigma<\/strong><\/h3>\n\n\n\n<p><a href=\"https:\/\/www.lean.org\/lexicon-terms\/lean-thinking-and-practice\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">O Lean<\/a>&nbsp;tradicionalmente \u00e9 usado por empresas de manufatura, mas seus princ\u00edpios s\u00e3o \u00fateis em todos os setores e, como o pr\u00f3prio nome sugere, os projetos de melhoria do processo Lean se concentram na redu\u00e7\u00e3o do desperd\u00edcio. Particularmente, o Lean visa eliminar quaisquer atividades que n\u00e3o agreguem valor ao usu\u00e1rio final dos produtos ou servi\u00e7os. A sua metodologia \u00e9 composta pelas seguintes etapas:<\/p>\n\n\n\n<ul>\n<li>Identificar valor<\/li>\n\n\n\n<li>Fluxo de valor do mapa<\/li>\n\n\n\n<li>Criar fluxo<\/li>\n\n\n\n<li>Estabelecer atra\u00e7\u00e3o<\/li>\n\n\n\n<li>Procurar perfei\u00e7\u00e3o<\/li>\n<\/ul>\n\n\n\n<p>O Lean Six Sigma \u00e9 o h\u00edbrido dos dois m\u00e9todos, e ajuda as organiza\u00e7\u00f5es a melhorar os processos por meio do DMAIC e, ao mesmo tempo, eliminar o desperd\u00edcio.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Gest\u00e3o da qualidade total (TQM)<\/strong><\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/total-quality-management-mind-map-cc0650ce-60e0-419b-943c-36a6c5aeeca6\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-de-Gestao-da-Qualidade-Total.png\" alt=\"Mapa Mental de Gest\u00e3o da Qualidade Total\" class=\"wp-image-9162\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-de-Gestao-da-Qualidade-Total.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-de-Gestao-da-Qualidade-Total-300x232.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-de-Gestao-da-Qualidade-Total-1024x791.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-de-Gestao-da-Qualidade-Total-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/total-quality-management-mind-map-cc0650ce-60e0-419b-943c-36a6c5aeeca6\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>O gerenciamento de qualidade total (TQM) teve seu apogeu na d\u00e9cada de 1980 e no in\u00edcio da d\u00e9cada de 1990, antes do surgimento do Lean e do Six Sigma, mas seus principais objetivos ainda s\u00e3o v\u00e1lidos. Os planos de desenvolvimento do processo TQM concentram-se principalmente no controle de qualidade, garantindo que a produ\u00e7\u00e3o de empresas ou ind\u00fastrias seja da mais alta qualidade poss\u00edvel e determinando maneiras de tornar a produ\u00e7\u00e3o ainda melhor.<\/p>\n\n\n\n<p>TQM n\u00e3o tem etapas como a maioria dos outros m\u00e9todos de melhoria de processos. Em vez disso, ele concentra-se nos <a href=\"https:\/\/asq.org\/quality-resources\/total-quality-management\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">princ\u00edpios<\/a>&nbsp;que devem orientar uma organiza\u00e7\u00e3o com uma mentalidade de TQM:<\/p>\n\n\n\n<ul>\n<li>Focado no cliente<\/li>\n\n\n\n<li>Envolvimento total dos funcion\u00e1rios<\/li>\n\n\n\n<li>Centrado no processo<\/li>\n\n\n\n<li>Integra\u00e7\u00e3o total da equipe<\/li>\n\n\n\n<li>Estrat\u00e9gico e sist\u00eamico<\/li>\n\n\n\n<li>Cont\u00ednuo<\/li>\n\n\n\n<li>Decis\u00f5es baseadas em dados<\/li>\n\n\n\n<li>Comunica\u00e7\u00e3o constante<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Plan-Do-Check-Act (PDCA)<\/strong><\/h3>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/plan-do-check-act-process-improvement-mind-map-b8a6d19c-83e1-48a8-a243-6538179ef7f1\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planejar-fazer-verificar-agir-mapa-mental-de-melhoria-de-processos.png\" alt=\"Planejar, fazer, verificar, agir, mapa mental de melhoria de processos\" class=\"wp-image-9163\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planejar-fazer-verificar-agir-mapa-mental-de-melhoria-de-processos.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planejar-fazer-verificar-agir-mapa-mental-de-melhoria-de-processos-300x232.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planejar-fazer-verificar-agir-mapa-mental-de-melhoria-de-processos-1024x791.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planejar-fazer-verificar-agir-mapa-mental-de-melhoria-de-processos-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/plan-do-check-act-process-improvement-mind-map-b8a6d19c-83e1-48a8-a243-6538179ef7f1\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Plan-Do-Check-Act (PDCA), ou Planejar-Fazer-Verificar-Agir, \u00e9 um ciclo de gerenciamento de melhoria cont\u00ednua que foi estabelecido pela primeira vez pelo engenheiro e consultor de gest\u00e3o W. Edwards Deming na d\u00e9cada de 1950. Naquela \u00e9poca essa metodologia era chamada de <a href=\"https:\/\/www.praxisframework.org\/files\/pdsa-history-ron-moen.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Ro<\/a><a href=\"https:\/\/www.praxisframework.org\/files\/pdsa-history-ron-moen.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">d<\/a><a href=\"https:\/\/www.praxisframework.org\/files\/pdsa-history-ron-moen.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">a Deming<\/a>, que mais tarde foi modificada por engenheiros japoneses para chegar \u00e0 sua defini\u00e7\u00e3o atual.<\/p>\n\n\n\n<p>As etapas envolvidas no PDCA s\u00e3o \u00f3bvias:<\/p>\n\n\n\n<ul>\n<li>Plano<\/li>\n\n\n\n<li>Fazer<\/li>\n\n\n\n<li>Verificar<\/li>\n\n\n\n<li>Agir<\/li>\n<\/ul>\n\n\n\n<p><strong><a href=\"#toc\">Volte ao \u00edndice<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4\"><strong>O que \u00e9 um projeto de melhoria de processo?<\/strong><\/h2>\n\n\n\n<p>Como o nome sugere, a melhoria de processos refere-se \u00e0 tarefa de identificar, analisar e melhorar os processos de neg\u00f3cios existentes que muitas vezes est\u00e3o desatualizados ou n\u00e3o s\u00e3o mais eficientes.<\/p>\n\n\n\n<p>Embora o termo seja usado com mais frequ\u00eancia em um contexto de neg\u00f3cios, ele pode se referir a qualquer decis\u00e3o ou a\u00e7\u00e3o que vise melhorar um processo, seja t\u00e3o simples como encontrar uma rota mais curta para o trabalho ou t\u00e3o complexo quanto melhorar todo o atendimento ao cliente<\/p>\n\n\n\n<p>De volta ao seu contexto de neg\u00f3cios, a melhoria do processo pode visar a economia de mat\u00e9rias primas, um design de escrit\u00f3rio ruim, o tempo de inatividade do sistema de TI, <a href=\"https:\/\/pt.venngage.com\/blog\/job-aid\/\" target=\"_blank\" rel=\"noreferrer noopener\">baixo desempenho de funcion\u00e1rios<\/a>&nbsp;e muitos outros problemas que podem condenar uma organiza\u00e7\u00e3o.<\/p>\n\n\n\n<p>A melhoria do processo n\u00e3o pode ser eficaz sem a implementa\u00e7\u00e3o de pol\u00edticas adequadas <a href=\"https:\/\/venngage.com\/blog\/process-documentation\/\" target=\"_blank\" rel=\"noreferrer noopener\">de documenta\u00e7\u00e3o do processo (em ingl\u00eas).<\/a> Se voc\u00ea ainda n\u00e3o documentou os processos da sua empresa, a Venngage pode te ajudar com isso. Confira esses <a href=\"https:\/\/pt.venngage.com\/blog\/documentacao-de-processos\/\" target=\"_blank\" rel=\"noreferrer noopener\">modelos de documenta\u00e7\u00e3o de processo<\/a>&nbsp;para come\u00e7ar.<\/p>\n\n\n\n<p>Existem mais de um tipo de projeto de melhoria de processo, que <a href=\"https:\/\/venngage.com\/blog\/process-improvement-plan\/#types\" target=\"_blank\" rel=\"noreferrer noopener\">exploraremos mais detalhadamente<\/a>. Al\u00e9m do exemplo compartilhado acima, um plano de melhoria de processo tamb\u00e9m pode consistir em 6 etapas:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/6-step-process-improvement-plan-mind-map-0178faa1-4585-4efa-9dc6-b7659f86f6c5\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-mental-do-plano-de-melhoria-de-processos-em-6-etapas.png\" alt=\"Mapa mental do plano de melhoria de processos em 6 etapas\" class=\"wp-image-9164\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-mental-do-plano-de-melhoria-de-processos-em-6-etapas.png 1344w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-mental-do-plano-de-melhoria-de-processos-em-6-etapas-300x182.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-mental-do-plano-de-melhoria-de-processos-em-6-etapas-1024x622.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-mental-do-plano-de-melhoria-de-processos-em-6-etapas-730x443.png 730w\" sizes=\"(max-width: 1344px) 100vw, 1344px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/6-step-process-improvement-plan-mind-map-0178faa1-4585-4efa-9dc6-b7659f86f6c5\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/6-step-process-improvement-plan-8dfaf8b7-a7ae-40cd-9baa-48c545b3a76f\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-melhoria-de-processo-em-6-etapas.png\" alt=\"Plano de melhoria de processo em 6 etapas\" class=\"wp-image-9165\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-melhoria-de-processo-em-6-etapas.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-melhoria-de-processo-em-6-etapas-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-melhoria-de-processo-em-6-etapas-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Plano-de-melhoria-de-processo-em-6-etapas-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/6-step-process-improvement-plan-8dfaf8b7-a7ae-40cd-9baa-48c545b3a76f\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Ou 4 etapas, como este desenvolvido usando o modelo <a href=\"https:\/\/pt.venngage.com\/blog\/ciclo-pdca\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plan-Do-Check-Act (PDCA):<\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/diagrams\/plan-do-check-act-improvement-cycle-flowchart-ff50fb45-3fc9-44d6-8bbd-c473a701fa8a\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-Ciclo-de-Melhoria-Planejar-Fazer-Verificar-Agir.png\" alt=\"Fluxograma do Ciclo de Melhoria Planejar, Fazer, Verificar Agir\" class=\"wp-image-9166\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-Ciclo-de-Melhoria-Planejar-Fazer-Verificar-Agir.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-Ciclo-de-Melhoria-Planejar-Fazer-Verificar-Agir-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-Ciclo-de-Melhoria-Planejar-Fazer-Verificar-Agir-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Fluxograma-do-Ciclo-de-Melhoria-Planejar-Fazer-Verificar-Agir-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/diagrams\/plan-do-check-act-improvement-cycle-flowchart-ff50fb45-3fc9-44d6-8bbd-c473a701fa8a\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Essas etapas s\u00e3o, obviamente, bastante simplificadas, e alguns projetos de melhoria de processo exigir\u00e3o meses ou anos de mudan\u00e7as nos procedimentos, pr\u00e1ticas de contrata\u00e7\u00e3o, treinamento, sistemas, software e muito mais.<\/p>\n\n\n\n<p>Por exemplo, um projeto de melhoria de processo para uma empresa que n\u00e3o possui um conjunto de habilidades espec\u00edficas em seus funcion\u00e1rios pode significar a contrata\u00e7\u00e3o de novos funcion\u00e1rios e o treinamento dos j\u00e1 existentes. Em casos como este, outras ferramentas como <a href=\"https:\/\/pt.venngage.com\/blog\/plano-de-treinamento\/\" target=\"_blank\" rel=\"noreferrer noopener\">planos de desenvolvimento individual<\/a>&nbsp;podem ser \u00fateis.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/healthcare-individual-development-plan-process-infographic-c88a097d-e12a-48f3-9b68-657958600fbf\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-desenvolvimento-individual-de-saude.png\" alt=\"Modelo de infogr\u00e1fico do processo de plano de desenvolvimento individual de sa\u00fade\" class=\"wp-image-9167\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-desenvolvimento-individual-de-saude.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-desenvolvimento-individual-de-saude-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-desenvolvimento-individual-de-saude-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-desenvolvimento-individual-de-saude-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/healthcare-individual-development-plan-process-infographic-c88a097d-e12a-48f3-9b68-657958600fbf\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Este plano de desenvolvimento individual projetado para profissionais de sa\u00fade \u00e9 um bom exemplo de como os projetos de melhoria de processos podem se ramificar em outras \u00e1reas.<\/p>\n\n\n\n<p>E uma vez que o novo processo esteja em vigor, \u00e9 importante comunic\u00e1-lo \u00e0 todos da equipe de forma eficaz. Isso pode ser feito por meio de um <a href=\"https:\/\/pt.venngage.com\/blog\/infografico-de-processo\/\" target=\"_blank\" rel=\"noreferrer noopener\">infogr\u00e1fico de processo<\/a>, <a href=\"https:\/\/pt.venngage.com\/blog\/modelos-de-cronograma\/\" target=\"_blank\" rel=\"noreferrer noopener\">linha do tempo<\/a>, mapa mental ou outros tipos de <a href=\"https:\/\/pt.venngage.com\/blog\/comunicacao-visual\/\" target=\"_blank\" rel=\"noreferrer noopener\">comunica\u00e7\u00e3o visual<\/a>.<\/p>\n\n\n\n<p>Personalize este plano de comunica\u00e7\u00e3o para ajudar a simplificar a comunica\u00e7\u00e3o interna entre as equipes que trabalham em um mesmo projeto:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/simple-project-management-communication-plan-8f14ff72-73f2-491e-8e49-7dac8c5d0929\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-plano-de-comunicacao-de-gerenciamento-de-projetos.png\" alt=\"Modelo simples de plano de comunica\u00e7\u00e3o de gerenciamento de projetos\" class=\"wp-image-9168\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-plano-de-comunicacao-de-gerenciamento-de-projetos.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-plano-de-comunicacao-de-gerenciamento-de-projetos-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-plano-de-comunicacao-de-gerenciamento-de-projetos-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-plano-de-comunicacao-de-gerenciamento-de-projetos-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/simple-project-management-communication-plan-8f14ff72-73f2-491e-8e49-7dac8c5d0929\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE PLANO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Outro exemplo de um projeto de melhoria de processo, este plano de cuidados de enfermagem \u00e9 ideal para ser usado em um ambiente de sa\u00fade. Ele pode ser usado para ilustrar um novo plano destinado a resolver problemas na comunica\u00e7\u00e3o e no atendimento ao paciente. Mas voc\u00ea tamb\u00e9m pode usar o processo sugerido neste plano e aplic\u00e1-lo a qualquer outro setor.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/how-to-write-a-nursing-care-plan-process-infographic-2298fe21-4e5f-432f-ace1-c594e201fb5a\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem.png\" alt=\"Como redigir um infogr\u00e1fico do processo do plano de cuidados de enfermagem\" class=\"wp-image-9169\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem-52x300.png 52w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem-178x1024.png 178w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem-267x1536.png 267w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem-356x2048.png 356w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Como-redigir-um-infografico-do-processo-do-plano-de-cuidados-de-enfermagem-730x4200.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/how-to-write-a-nursing-care-plan-process-infographic-2298fe21-4e5f-432f-ace1-c594e201fb5a\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Este modelo de infogr\u00e1fico \u00e9 uma boa maneira de compartilhar com uma equipe criativa um novo m\u00e9todo proposto para levar os clientes ao longo do processo de design. Considere codificar por cores as etapas novas ou revisadas ao criar uma pe\u00e7a como esta para compartilhar um processo revisado da empresa.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/creative-design-process-e5292978-0d13-40d6-95bc-c7f0366bee04\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho.png\" alt=\"Infogr\u00e1fico de fluxo de trabalho\" class=\"wp-image-9170\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho-194x300.png 194w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho-663x1024.png 663w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho-994x1536.png 994w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-de-fluxo-de-trabalho-730x1128.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/creative-design-process-e5292978-0d13-40d6-95bc-c7f0366bee04\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Personalize este mapa mental do plano de a\u00e7\u00e3o depois de definir um novo processo para que os membros da equipe vejam as etapas envolvidas em suas tarefas, mas tamb\u00e9m mantenham os objetivos principais em mente.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/company-action-plan-mind-map-b4ba7765-62de-4f1d-9249-67d2ffff56ae\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Acao.png\" alt=\"Mapa Mental do Plano de A\u00e7\u00e3o\" class=\"wp-image-9171\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Acao.png 1056w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Acao-300x232.png 300w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Acao-1024x791.png 1024w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Mapa-Mental-do-Plano-de-Acao-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/company-action-plan-mind-map-b4ba7765-62de-4f1d-9249-67d2ffff56ae\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE MAPA MENTAL<\/b><\/button><\/a><\/p>\n\n\n\n<p><strong><a href=\"#toc\">Volte ao \u00edndice<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5\"><strong>Tipos de projetos de melhoria de processo e exemplos<\/strong><\/h2>\n\n\n\n<p>Os planos de melhoria de processo s\u00e3o \u00fateis para organiza\u00e7\u00f5es de todos os tipos e sua constru\u00e7\u00e3o pode incluir instru\u00e7\u00f5es verbais simples. Mas a maioria das empresas se beneficia da cria\u00e7\u00e3o de gr\u00e1ficos, apresenta\u00e7\u00f5es e infogr\u00e1ficos para comunicar uma variedade de aspectos relacionados ao plano.<\/p>\n\n\n\n<p>Confira estes modelos de plano de melhoria de processos que podem ajudar sua organiza\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Exemplos de desenvolvimento de projetos de melhoria de processo<\/strong><\/h3>\n\n\n\n<p>Desenvolver um plano de melhoria de processo pode ser algo complicado, mas ferramentas visuais como infogr\u00e1ficos podem facilitar a compreens\u00e3o das etapas envolvidas por sua equipe.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/planning-cycle-process-infographic-b56cd9a0-a618-4872-a0d6-52598945afa3\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento.png\" alt=\"Infogr\u00e1fico do processo do ciclo de planejamento\" class=\"wp-image-9172\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento-75x300.png 75w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento-257x1024.png 257w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento-386x1536.png 386w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento-514x2048.png 514w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Infografico-do-processo-do-ciclo-de-planejamento-730x2907.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/planning-cycle-process-infographic-b56cd9a0-a618-4872-a0d6-52598945afa3\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Ajude sua equipe de gerenciamento e funcion\u00e1rios a entender as etapas envolvidas no ciclo PDCA (plan-do-check-act) com este infogr\u00e1fico. Personalize-o de acordo com suas necessidades, descrevendo as a\u00e7\u00f5es espec\u00edficas que eles precisam realizar na se\u00e7\u00e3o inferior.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/pdca-continuous-change-management-process-771a0086-6b9b-484f-866f-f95a2690e079\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Processo-de-gerenciamento-de-mudancas-continuas-PDCA.png\" alt=\"Processo de gerenciamento de mudan\u00e7as cont\u00ednuas PDCA\" class=\"wp-image-9173\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Processo-de-gerenciamento-de-mudancas-continuas-PDCA.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Processo-de-gerenciamento-de-mudancas-continuas-PDCA-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Processo-de-gerenciamento-de-mudancas-continuas-PDCA-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Processo-de-gerenciamento-de-mudancas-continuas-PDCA-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/pdca-continuous-change-management-process-771a0086-6b9b-484f-866f-f95a2690e079\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Este infogr\u00e1fico do ciclo PDCA \u00e9 ideal para empresas que est\u00e3o implementando planos de melhoria em toda a organiza\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Exemplos de processos revisados<\/strong><\/h3>\n\n\n\n<p>Depois de definir uma nova maneira de fazer as coisas, \u00e9 fundamental explicar o novo processo claramente aos funcion\u00e1rios (e \u00e0s vezes aos clientes). Os infogr\u00e1ficos do processo e da linha do tempo s\u00e3o \u00fateis, pois permitem que as pessoas visualizem cada novo passo que deve ser dado.<\/p>\n\n\n\n<p>Aqui est\u00e1 um exemplo de um projeto de melhoria de processo para a revis\u00e3o do procedimento de suporte ao cliente, constru\u00eddo com base no conceito PDCA:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/plan-do-check-act-process-for-customer-support-cc96c820-b773-4652-939d-05759ba407f8\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente.png\" alt=\"Planeje, fa\u00e7a, verifique o processo de a\u00e7\u00e3o para suporte ao cliente\" class=\"wp-image-9174\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente.png 1268w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente-152x300.png 152w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente-520x1024.png 520w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente-780x1536.png 780w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente-1040x2048.png 1040w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Planeje-faca-verifique-o-processo-de-acao-para-suporte-ao-cliente-730x1438.png 730w\" sizes=\"(max-width: 1268px) 100vw, 1268px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/plans\/plan-do-check-act-process-for-customer-support-cc96c820-b773-4652-939d-05759ba407f8\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Personalize este infogr\u00e1fico de gerenciamento de projetos para o novo processo que voc\u00ea e seus colegas de equipe est\u00e3o criando. Troque os \u00edcones por aqueles que se aplicam ao seu neg\u00f3cio e use a nossa ferramenta <a href=\"https:\/\/pt.venngage.com\/blog\/minha-marca\/\" target=\"_blank\" rel=\"noreferrer noopener\">Minha Marca<\/a>&nbsp;para garantir que o design esteja alinhado com sua identidade corporativa.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/5-stages-for-managing-a-project-process-infographic-d78513db-84d2-4e59-845d-b978d8c24402\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/5-etapas-para-gerenciar-um-modelo-de-infografico-de-processo-de-projeto.png\" alt=\"5 etapas para gerenciar um modelo de infogr\u00e1fico de processo de projeto\" class=\"wp-image-9175\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/5-etapas-para-gerenciar-um-modelo-de-infografico-de-processo-de-projeto.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/5-etapas-para-gerenciar-um-modelo-de-infografico-de-processo-de-projeto-163x300.png 163w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/5-etapas-para-gerenciar-um-modelo-de-infografico-de-processo-de-projeto-557x1024.png 557w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/5-etapas-para-gerenciar-um-modelo-de-infografico-de-processo-de-projeto-730x1342.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/5-stages-for-managing-a-project-process-infographic-d78513db-84d2-4e59-845d-b978d8c24402\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Use este infogr\u00e1fico colorido para apresentar um novo processo que possui v\u00e1rias etapas. Aumente ou encurte de acordo com sua necessidade para cobrir todas as etapas do seu processo revisado. Ou use um modelo como este para criar um plano de a\u00e7\u00e3o de melhoria de processo ao iniciar seu trabalho.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/manager-planning-guide-process-infographic-3fbebe03-45b0-4579-8411-3d8937b3ded0\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente.png\" alt=\"Modelo de infogr\u00e1fico de processo do guia de planejamento do gerente\" class=\"wp-image-9176\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente-138x300.png 138w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente-470x1024.png 470w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente-705x1536.png 705w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-do-guia-de-planejamento-do-gerente-730x1592.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/manager-planning-guide-process-infographic-3fbebe03-45b0-4579-8411-3d8937b3ded0\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Exemplos de pol\u00edticas revisadas<\/strong><\/h3>\n\n\n\n<p>Os planos de desenvolvimento de processo podem facilmente se espalhar para uma variedade de \u00e1reas de neg\u00f3cios, e muitas vezes \u00e9 necess\u00e1rio criar novas pol\u00edticas e procedimentos para seu novo processo. Infogr\u00e1ficos e outras ferramentas podem ajud\u00e1-lo a divulgar e documentar essas novas pol\u00edticas.<\/p>\n\n\n\n<p>Se o seu novo processo exigir documenta\u00e7\u00e3o adicional que precisa ser assinada por um funcion\u00e1rio ou seu supervisor, personalize este infogr\u00e1fico de procedimento que explora como enviar relat\u00f3rios de despesas. Altere o t\u00edtulo, o conte\u00fado e as ilustra\u00e7\u00f5es de acordo com suas necessidades.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/simple-employee-expense-claim-process-infographic-template-f9a4ede5-4fcf-4531-80d0-a38f143bf36c\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-infografico-de-processo-de-reivindicacao-de-despesas-de-funcionarios.png\" alt=\"Modelo simples de infogr\u00e1fico de processo de reivindica\u00e7\u00e3o de despesas de funcion\u00e1rios\" class=\"wp-image-9177\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-infografico-de-processo-de-reivindicacao-de-despesas-de-funcionarios.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-infografico-de-processo-de-reivindicacao-de-despesas-de-funcionarios-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-infografico-de-processo-de-reivindicacao-de-despesas-de-funcionarios-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-simples-de-infografico-de-processo-de-reivindicacao-de-despesas-de-funcionarios-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/simple-employee-expense-claim-process-infographic-template-f9a4ede5-4fcf-4531-80d0-a38f143bf36c\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Talvez seu plano de melhoria de processo tenha revelado que ningu\u00e9m em sua organiza\u00e7\u00e3o est\u00e1 preparado para um desastre ou emerg\u00eancia. O resultado de sua equipe de melhoria de processos pode ser um plano de continuidade de neg\u00f3cios como este.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/5-step-guide-business-plan-process-infographic-bd71b893-96f3-40f4-b0c4-28d834009ecd\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas.png\" alt=\"Modelo de infogr\u00e1fico do processo de plano de neg\u00f3cios com guia de 5 etapas\" class=\"wp-image-9178\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas-129x300.png 129w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas-440x1024.png 440w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas-660x1536.png 660w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-plano-de-negocios-com-guia-de-5-etapas-730x1700.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/5-step-guide-business-plan-process-infographic-bd71b893-96f3-40f4-b0c4-28d834009ecd\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Exemplos de desenvolvimento de funcion\u00e1rios<\/strong><\/h3>\n\n\n\n<p>O sucesso de seu novo processo depender\u00e1 inteiramente da capacidade de sua equipe de execut\u00e1-lo, e muitas organiza\u00e7\u00f5es descobrem que um dos principais motivos pelos quais seus processos atuais n\u00e3o est\u00e3o funcionando \u00e9 que os membros da equipe carecem de certas habilidades. Portanto, o desenvolvimento do funcion\u00e1rio geralmente est\u00e1 envolvido na execu\u00e7\u00e3o de um plano revisado.<\/p>\n\n\n\n<p>Ajude os membros da sua equipe a visualizar as habilidades que precisam desenvolver trabalhando com eles na cria\u00e7\u00e3o de um <a href=\"https:\/\/pt.venngage.com\/features\/fazer-mapa-mental\" target=\"_blank\" rel=\"noreferrer noopener\">mapa mental<\/a> como este.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/career-plan-mind-map-565d5aa8-63d1-4feb-9bd8-4acbc83e2062\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-mapa-mental-de-plano-de-carreira.png\" alt=\"Modelo de mapa mental de plano de carreira\" class=\"wp-image-9179\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-mapa-mental-de-plano-de-carreira.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-mapa-mental-de-plano-de-carreira-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-mapa-mental-de-plano-de-carreira-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-mapa-mental-de-plano-de-carreira-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/mind-maps\/career-plan-mind-map-565d5aa8-63d1-4feb-9bd8-4acbc83e2062\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE MAPA MENTAL<\/b><\/button><\/a><\/p>\n\n\n\n<p>Personalize este infogr\u00e1fico de planejamento de carreira para os membros da equipe para ajud\u00e1-los a desenvolver as habilidades necess\u00e1rias. Embora este exemplo seja sobre planejamento de carreira em geral, \u00e9 f\u00e1cil personaliz\u00e1-lo com detalhes espec\u00edficos.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/8-step-career-planning-process-infographic-619f4513-0e0e-4327-a0b9-3d445e6af35b\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-planejamento-de-carreira-em-8-etapas.png\" alt=\"Modelo de infogr\u00e1fico do processo de planejamento de carreira em 8 etapas\" class=\"wp-image-9180\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-planejamento-de-carreira-em-8-etapas.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-planejamento-de-carreira-em-8-etapas-193x300.png 193w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-planejamento-de-carreira-em-8-etapas-658x1024.png 658w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-do-processo-de-planejamento-de-carreira-em-8-etapas-730x1136.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/8-step-career-planning-process-infographic-619f4513-0e0e-4327-a0b9-3d445e6af35b\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Exemplos de gerenciamento de mudan\u00e7as<\/strong><\/h3>\n\n\n\n<p>Os seres humanos, por natureza, s\u00e3o resistentes \u00e0 mudan\u00e7a e os membros da sua organiza\u00e7\u00e3o podem achar dif\u00edcil implementar um novo processo. Esses <a href=\"https:\/\/venngage.com\/blog\/change-management-plan\/\" target=\"_blank\" rel=\"noreferrer noopener\">planos de gerenciamento de mudan\u00e7as (em ingl\u00eas)<\/a>&nbsp;podem ajud\u00e1-lo a se comunicar e motivar sua equipe.<\/p>\n\n\n\n<p>Siga as etapas deste infogr\u00e1fico <a href=\"https:\/\/venngage.com\/blog\/change-management-process\/\" target=\"_blank\" rel=\"noreferrer noopener\">do processo de gerenciamento de mudan\u00e7as (em ingl\u00eas)<\/a>&nbsp;para romper com a ades\u00e3o obstinada de sua equipe a processos antigos e ineficientes e melhorar o clima organizacional da sua empresa.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/the-8-step-process-for-leading-change-infographic-f65fa4ec-7bbd-418a-bd00-9a580970fcaf\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider.png\" alt=\"Modelo de infogr\u00e1fico de processo de mudan\u00e7a l\u00edder\" class=\"wp-image-9181\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider-62x300.png 62w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider-212x1024.png 212w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider-318x1536.png 318w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider-424x2048.png 424w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-de-processo-de-mudanca-lider-730x3527.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/the-8-step-process-for-leading-change-infographic-f65fa4ec-7bbd-418a-bd00-9a580970fcaf\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p>Atualize este infogr\u00e1fico do processo de planejamento para ajudar a colocar sua equipe do lado da mudan\u00e7a. Os funcion\u00e1rios que sentem que est\u00e3o envolvidos na orienta\u00e7\u00e3o da empresa costumam desenvolver um forte senso de propriedade em toda a opera\u00e7\u00e3o de melhoria do processo.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/colorful-planning-process-infographic-d1282b25-9609-46f9-9c7a-9d273174984f\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-colorido-do-processo-de-planejamento.png\" alt=\"Modelo de infogr\u00e1fico colorido do processo de planejamento\" class=\"wp-image-9182\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-colorido-do-processo-de-planejamento.png 816w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-colorido-do-processo-de-planejamento-232x300.png 232w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-colorido-do-processo-de-planejamento-791x1024.png 791w, https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/Modelo-de-infografico-colorido-do-processo-de-planejamento-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/pt.venngage.com\/templates\/infographics\/colorful-planning-process-infographic-d1282b25-9609-46f9-9c7a-9d273174984f\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CRIE ESTE MODELO DE INFOGR\u00c1FICO<\/b><\/button><\/a><\/p>\n\n\n\n<p><strong><a href=\"#toc\">Volte ao \u00edndice<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6\"><strong>Quais s\u00e3o os benef\u00edcios de estabelecer um plano de melhoria cont\u00ednua de processos?<\/strong><\/h2>\n\n\n\n<p>H\u00e1 muitos benef\u00edcios em mergulhar em um projeto de melhoria de processos em sua organiza\u00e7\u00e3o, e o mais \u00f3bvio e importante \u00e9 melhorar a efici\u00eancia geral de sua empresa. Isso pode aumentar o seu faturamento e tornar o neg\u00f3cio mais lucrativo a longo prazo. Mas n\u00e3o \u00e9 a\u00ed que os benef\u00edcios terminam.<\/p>\n\n\n\n<p>Os maiores benef\u00edcios de um projeto de melhoria de processo incluem:<\/p>\n\n\n\n<ul>\n<li><strong>Satisfa\u00e7\u00e3o dos funcion\u00e1rios<\/strong>: trabalhadores mais produtivos geram mais dinheiro para a empresa ao longo do tempo, mas tamb\u00e9m ganham um senso de realiza\u00e7\u00e3o e auto aperfei\u00e7oamento.<\/li>\n\n\n\n<li><strong>Satisfa\u00e7\u00e3o do cliente<\/strong>: muitos planos de melhoria de processo visam tarefas voltadas para seus clientes, e garantir que eles estejam satisfeitos \u00e9 crucial para qualquer organiza\u00e7\u00e3o.<\/li>\n\n\n\n<li><strong>Agilidade<\/strong>: o cen\u00e1rio de neg\u00f3cios est\u00e1 em constante mudan\u00e7a, portanto, implementar uma estrat\u00e9gia de melhoria de processos equipar\u00e1 sua organiza\u00e7\u00e3o para lidar com problemas futuros.<\/li>\n\n\n\n<li><strong>Seguran\u00e7a<\/strong>: processos eficientes s\u00e3o \u00fateis para reduzir acidentes de trabalho e les\u00f5es por esfor\u00e7o repetitivo, e examinar as atividades f\u00edsicas que os funcion\u00e1rios realizam como parte de seus trabalhos pode ajudar a torn\u00e1-los mais seguros de um modo geral.<\/li>\n\n\n\n<li><strong>Moderniza\u00e7\u00e3o<\/strong>: as organiza\u00e7\u00f5es que resistem \u00e0 tecnologia provavelmente n\u00e3o durar\u00e3o muito no mundo, e os planos de melhoria de processos s\u00e3o ideais para adaptar novas tecnologias aos fluxos de trabalho de sua empresa.<\/li>\n\n\n\n<li><strong>Inova\u00e7\u00e3o<\/strong>: Em qualquer empresa, h\u00e1 coisas que voc\u00ea faz porque sempre foi assim. Mas quebrar esses processos para ver como eles funcionam \u00e9 uma das melhores maneiras de desencadear uma nova ideia e criar inova\u00e7\u00e3o em sua organiza\u00e7\u00e3o.<\/li>\n<\/ul>\n\n\n\n<p><strong><a href=\"#toc\">Volte ao \u00edndice<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7\"><strong>Perguntas frequentes sobre o projeto de melhoria de processo<\/strong><\/h2>\n\n\n\n<p>Voc\u00ea tem mais d\u00favidas sobre como criar um projeto de melhoria de processos para sua organiza\u00e7\u00e3o? Confira abaixo algumas respostas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Como propor um plano de melhoria de processo?<\/strong><\/h3>\n\n\n\n<p>A comunica\u00e7\u00e3o \u00e9 uma parte crucial da melhoria do processo. Se as pessoas n\u00e3o souberem ou entenderem por que a mudan\u00e7a \u00e9 necess\u00e1ria, \u00e9 bem prov\u00e1vel que n\u00e3o adotem os novos processos. A proposta de um plano de melhoria de processo requer que um indiv\u00edduo ou pequeno grupo assuma o desenvolvimento do plano do in\u00edcio ao fim e seja o divulgador do plano em toda a organiza\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Quais s\u00e3o os conte\u00fados de um projeto de melhoria de processos?<\/strong><\/h3>\n\n\n\n<p>Em geral, os projetos de melhoria de processo devem incluir uma defini\u00e7\u00e3o do processo, uma explica\u00e7\u00e3o de suas etapas, uma identifica\u00e7\u00e3o das falhas, uma proposta de novo processo e um mecanismo para monitorar as etapas revisadas.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Como voc\u00ea encontra \u00e1reas que precisam de melhoria de processo?<\/strong><\/h3>\n\n\n\n<p>Se voc\u00ea soubesse exatamente por que sua organiza\u00e7\u00e3o n\u00e3o foi t\u00e3o bem-sucedida, consertaria isso imediatamente. Mas encontrar \u00e1reas que precisam de melhoria de processo significa manter os ouvidos atentos e observar a organiza\u00e7\u00e3o de maneira objetiva. \u00c1reas comuns de melhoria de processo incluem sobreposi\u00e7\u00e3o de autoridade, prazos constantemente perdidos, controle de qualidade ruim, problemas de seguran\u00e7a f\u00edsica, corre\u00e7\u00e3o de erros em vez de preveni-los, insatisfa\u00e7\u00e3o de funcion\u00e1rios e clientes e gastos excessivos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Em resumo: os planos de melhoria de processos podem ajudar sua empresa a ser mais produtiva e eliminar a frustra\u00e7\u00e3o organizacional<\/strong><\/h2>\n\n\n\n<p>Identificar onde sua empresa est\u00e1 falhando nos processos usados em toda a organiza\u00e7\u00e3o n\u00e3o \u00e9 uma tarefa f\u00e1cil, pois requer um exame imparcial de como voc\u00ea pode estar falhando. Mas as ferramentas de comunica\u00e7\u00e3o visual, como infogr\u00e1ficos, mapas mentais e ilustra\u00e7\u00f5es de processos, podem ajudar a comunicar os problemas \u00e0 sua equipe e fazer com que todos sigam na dire\u00e7\u00e3o certa.<\/p>\n\n\n\n<p>Interessado em visualizar seus planos de melhoria de processos e obter ades\u00e3o das partes interessadas? Comece <a href=\"https:\/\/infograph.venngage.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\">registrando-se<\/a>&nbsp;em uma conta GRATUITA da Venngage e escolha um projeto de melhoria de processo adequado para personalizar. Nossos modelos t\u00eam apar\u00eancia profissional, s\u00e3o totalmente personaliz\u00e1veis e muito f\u00e1ceis de editar, mesmo que voc\u00ea n\u00e3o tenha experi\u00eancia em design.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/infograph.venngage.com\/signup\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>COMECE A CRIAR DE GRA\u00c7A<\/b><\/button><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Um projeto de melhoria de processo \u00e9 um documento abrangente e acion\u00e1vel que descreve as etapas necess\u00e1rias para aumentar a efici\u00eancia, a efic\u00e1cia e o desempenho geral dos processos e procedimentos em sua empresa. Essa ferramenta de gest\u00e3o tem como objetivo identificar \u00e1reas de melhoria, solucionar gargalos, simplificar o fluxo de trabalho e otimizar a [&hellip;]<\/p>\n","protected":false},"author":64,"featured_media":9155,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[14,31,57],"tags":[69,70],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"Saiba o que \u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\u00f3cio.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O que \u00e9 um projeto de melhoria de processo [+20 modelos inclu\u00eddos]\" \/>\n<meta property=\"og:description\" content=\"Saiba o que \u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\u00f3cio.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/\" \/>\n<meta property=\"og:site_name\" content=\"Venngage Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Venngage\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-24T15:49:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-11T20:12:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@venngage\" \/>\n<meta name=\"twitter:site\" content=\"@venngage\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jennifer Gaskin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"22 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/#website\",\"url\":\"https:\/\/pt.venngage.com\/blog\/\",\"name\":\"Venngage Blog\",\"description\":\"Venngage Infogr\\u00e1ficos\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pt.venngage.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#primaryimage\",\"inLanguage\":\"pt-BR\",\"url\":\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png\",\"contentUrl\":\"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png\",\"width\":1024,\"height\":576},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#webpage\",\"url\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/\",\"name\":\"O que \\u00e9 um projeto de melhoria de processo [+20 modelos inclu\\u00eddos]\",\"isPartOf\":{\"@id\":\"https:\/\/pt.venngage.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#primaryimage\"},\"datePublished\":\"2023-08-24T15:49:00+00:00\",\"dateModified\":\"2023-09-11T20:12:54+00:00\",\"author\":{\"@id\":\"https:\/\/pt.venngage.com\/blog\/#\/schema\/person\/8cc1e3b5aca2b570d611578ba442efda\"},\"description\":\"Saiba o que \\u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\\u00f3cio.\",\"breadcrumb\":{\"@id\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/pt.venngage.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Recursos Humanos\",\"item\":\"https:\/\/pt.venngage.com\/blog\/category\/recursos-humanos\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"O que \\u00e9 um projeto de melhoria de processo [+20 modelos inclu\\u00eddos]\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/#\/schema\/person\/8cc1e3b5aca2b570d611578ba442efda\",\"name\":\"Jennifer Gaskin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/pt.venngage.com\/blog\/#personlogo\",\"inLanguage\":\"pt-BR\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g\",\"caption\":\"Jennifer Gaskin\"},\"url\":\"https:\/\/pt.venngage.com\/blog\/author\/jennifer-gaskin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"Saiba o que \u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\u00f3cio.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/","og_locale":"pt_BR","og_type":"article","og_title":"O que \u00e9 um projeto de melhoria de processo [+20 modelos inclu\u00eddos]","og_description":"Saiba o que \u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\u00f3cio.","og_url":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/","og_site_name":"Venngage Blog","article_publisher":"https:\/\/www.facebook.com\/Venngage","article_published_time":"2023-08-24T15:49:00+00:00","article_modified_time":"2023-09-11T20:12:54+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png","type":"image\/png"}],"twitter_card":"summary","twitter_creator":"@venngage","twitter_site":"@venngage","twitter_misc":{"Written by":"Jennifer Gaskin","Est. reading time":"22 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/pt.venngage.com\/blog\/#website","url":"https:\/\/pt.venngage.com\/blog\/","name":"Venngage Blog","description":"Venngage Infogr\u00e1ficos","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pt.venngage.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"pt-BR"},{"@type":"ImageObject","@id":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#primaryimage","inLanguage":"pt-BR","url":"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png","contentUrl":"https:\/\/venngage-wordpress-pt.s3.amazonaws.com\/uploads\/2023\/08\/o-que-e-projeto-de-melhoria.png","width":1024,"height":576},{"@type":"WebPage","@id":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#webpage","url":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/","name":"O que \u00e9 um projeto de melhoria de processo [+20 modelos inclu\u00eddos]","isPartOf":{"@id":"https:\/\/pt.venngage.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#primaryimage"},"datePublished":"2023-08-24T15:49:00+00:00","dateModified":"2023-09-11T20:12:54+00:00","author":{"@id":"https:\/\/pt.venngage.com\/blog\/#\/schema\/person\/8cc1e3b5aca2b570d611578ba442efda"},"description":"Saiba o que \u00e9 um projeto de melhoria de processo e descubra como ele pode ajudar a melhorar o desempenho do seu neg\u00f3cio.","breadcrumb":{"@id":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pt.venngage.com\/blog\/o-que-e-projeto-de-melhoria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/pt.venngage.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Recursos Humanos","item":"https:\/\/pt.venngage.com\/blog\/category\/recursos-humanos\/"},{"@type":"ListItem","position":3,"name":"O que \u00e9 um projeto de melhoria de processo [+20 modelos inclu\u00eddos]"}]},{"@type":"Person","@id":"https:\/\/pt.venngage.com\/blog\/#\/schema\/person\/8cc1e3b5aca2b570d611578ba442efda","name":"Jennifer Gaskin","image":{"@type":"ImageObject","@id":"https:\/\/pt.venngage.com\/blog\/#personlogo","inLanguage":"pt-BR","url":"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g","caption":"Jennifer Gaskin"},"url":"https:\/\/pt.venngage.com\/blog\/author\/jennifer-gaskin\/"}]}},"_links":{"self":[{"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/9153"}],"collection":[{"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/comments?post=9153"}],"version-history":[{"count":8,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/9153\/revisions"}],"predecessor-version":[{"id":9867,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/9153\/revisions\/9867"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/media\/9155"}],"wp:attachment":[{"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/media?parent=9153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/categories?post=9153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pt.venngage.com\/blog\/wp-json\/wp\/v2\/tags?post=9153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}